AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Air force civil engineer center tyndall afb11/10/2023 ![]() “The program executives will form a corps that acts as a single champion for the CE enterprise,” Allen said. John Allen, AFCEC commander, said the new framework provides more stringent oversight and management for high-visibility, complex programs with multiple stakeholders and contributors. Part of the change includes a new capabilities-based program management framework that unifies programs through a corps of CE program executives.ĭubbed the “Unity of Effort” initiative, Maj. The AFIMSC enterprise is rolling out new approaches and analytical tools developed to restore installation readiness through cost-effective modernization, innovation and mission-needs-based prioritization. The new NDR mission is one component of a broader AFIMSC approach to managing infrastructure following the 2019 Air Force release of an Infrastructure Investment Strategy that provided a stark analysis of the degrading condition of the force’s 180 installations. The division also has a responsibility to ensure installations are more resilient to future natural disasters, Leighton said.Īt Tyndall AFB, the division is tackling a five-to-seven-year rebuild effort that includes 44 new military construction, or MILCON, and 260 facility sustainment restoration and modernization, or FSRM projects, valued at $4.9 billion. The division will serve as a strategic reserve of expertise equipped to tackle current and future natural disasters with capabilities that include damage assessment, requirements development and construction execution. “Installations are the foundation of Air Force readiness and lethality … they provide air power, training and they’re home to countless Airmen, Guardians and their families,” said Col. ![]() They are now aligned under a new program office, the Natural Disaster Recovery Division, focused on recovering bases like Tyndall AFB and Offutt AFB and rebuilding them with adaptive, resilient, right-sized and fiscally sustainable infrastructure that enhances combat power. Initially, the Air Force Civil Engineer Center Facility Engineering Directorate managed both of these recovery and rebuild projects through separate program management offices. ![]() ![]() In less than six months, natural disasters shut down two major bases and bottlenecked critical training and mission operations for months. A few months later and nearly 1,000 miles away, it was the icy waters of the Missouri and Platte rivers that engulfed nearly one third of Offutt AFB, Nebraska, following record rainfall and melting snow breaching nearby levees. JOINT BASE SAN ANTONIO-LACKLAND, Texas (AFNS) -įirst, it was Hurricane Michael, a Category 5 storm with sustained winds of 155 mph and pure destruction as the storm’s eye passed directly over Tyndall Air Force Base, Florida, Oct. Air Force Installation and Mission Support Center Public Affairs. ![]()
0 Comments
Read More
Leave a Reply. |